[SMM Weekly Review] 5.16-5.22, Weekly Price Trend Analysis of ESS DC-side Battery Cabin

Published: May 22, 2025 18:12
[SMM Weekly Review] This week, the price of DC-side battery cabins fluctuated relatively small. The average price of a 5MWh DC-side battery cabin was 0.43 yuan/Wh; the average price of a 3.44/3.77MWh DC-side battery cabin was 0.438 yuan/Wh

This week, the price of DC-side battery cabins experienced relatively small fluctuations. The average price of a 5MWh DC-side battery cabin was 0.43 yuan/Wh, while the average price of 3.44/3.77MWh DC-side battery cabins was 0.438 yuan/Wh. As the node for the full marketization of on-grid tariffs for incremental projects under Document No. 136 approaches, the detailed rules for the participation of energy storage in the power market mechanism are being successively introduced in various provinces. Before these rules are finalized, project owners are adopting a wait-and-see attitude. This week, the supply-demand pattern of the ESS market remained stable, with minimal price fluctuations for DC-side battery cabins. SMM predicts that the price of DC-side battery cabins may continue to fluctuate slightly in the short term.

On May 16, the winning bid result for the Engineering, Procurement, and Construction (EPC) + Operation and Maintenance (O&M) of the 1,000MW/6,000MWh power supply-side ESS project in Chayouzhongqi, Ulanqab City was announced. The project is located in Ulanqab City, Inner Mongolia Autonomous Region, with a scale of 1,000MW/6,000MWh. The bid winner offered a quotation of 6,252,099,970.35 yuan, which translates to a winning unit price of 1.042 yuan/Wh after conversion.

 

 

SMM New Energy Industry Research Department

Wang Cong 021-51666838

Yu Xiaodan 021-20707870

Ma Rui 021-51595780

Xu Ying 021-51666707

Feng Disheng 021-51666714

Liu Yujun 021-20707895

Lv Yanlin 021-20707875

Zhou Zhicheng 021-51666711

Zhang Haohan 021-51666752

Wang Zihan 021-51666914

Ren Xiaoxuan 021-20707866

Liang Yushuo 021-20707892

Wang Jie 021-51595902

Xu Yang 021-51666760

Chen Bolin 021-51666836

Data Source Statement: Except for publicly available information, all other data are processed by SMM based on publicly available information, market communication, and relying on SMM‘s internal database model. They are for reference only and do not constitute decision-making recommendations.

For any inquiries or to learn more information, please contact: lemonzhao@smm.cn
For more information on how to access our research reports, please contact:service.en@smm.cn
Related News
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
6 hours ago
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Read More
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
Beijing Launches 500-kV Power Project in Fengtai, Boosting Grid Resilience and Industrial Growth
On January 28th, the construction of the 500-kilovolt power transmission and transformation project in Fengtai, Beijing officially started. This project is the first newly-built 500-kilovolt power grid project in Beijing during the 15th Five-Year Plan period. It will significantly enhance the resilience and power receiving capacity of the southern Beijing power grid and provide reliable power support for Beijing to continuously optimize the investment structure and vigorously develop high-end, precise, and cutting-edge industries. The 500-kilovolt power transmission and transformation project in Fengtai, Beijing is a key project of Beijing's power grid during the 15th Five-Year Plan period and one of the "3 100" key projects in Beijing this year. It is constructed and managed by the State
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
6 hours ago
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Read More
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
Shaanxi-Anhui UHV DC Project's 500-kV AC System at Hezhou Station Begins Operation After Trial Run
On February 1st, the 500-kilovolt AC system of the Hezhou Converter Station, the receiving-end station of the ±800-kilovolt UHV DC power transmission project from northern Shaanxi to Anhui, was officially put into operation after a 24-hour trial run.
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
6 hours ago
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
Read More
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
750-kV Power Line Connecting Northern to Central Shaanxi Fully Operational
On February 2nd, the 750-kilovolt power transmission and transformation project of the third passageway from northern Shaanxi to central Shaanxi was fully connected. The project starts from the 750-kilovolt Shuofang Substation in Shenmu City in the north and ends at the 750-kilovolt Bailuyuan Substation in Lantian County in the south. It has newly built a 1,271-kilometer line, passing through 18 counties (districts) in 4 cities including Yulin, Yan'an, Weinan and Xi'an.
6 hours ago
[SMM Weekly Review] 5.16-5.22, Weekly Price Trend Analysis of ESS DC-side Battery Cabin - Shanghai Metals Market (SMM)